The project is described as one of the world's most significant undeveloped PGM deposits, with shallow, high-grade ore and potentially low production costs. A definitive feasibility study highlighted the value of a high-grade chromium by-product. In phase two, output is expected to exceed 400,000 ounces per year of PGMs and 1 million tonnes per year of high-grade chrome concentrate, giving the project a dual metals revenue stream.